Download: 52. Risk-Based Cost Estimating Methods II

Created: 27 May 2015

Document Info: Risk-Based Cost Estimating Methods. Presentation for WTC 2015 @ Dubrovnik, May 27, 2015.

Remarks: Presentation for World Tunnel Congress (WTC), May 27, 2015 @ Dubrovnik. Presentation developed with our business partners – thank you RiskConsult & John Reilly International.

With our publications for and at WTC15 and RETC15 we have demonstrated all necessary baselines with practical applications how to evaluate (“calculate”) schedules (milestones) and cost for any type of project with a defined reliability. And then how they may be periodically updated (“controlled”) during project execution.

We understand this approach as an internationally well-known and widely-accepted Best Practice now.
How come that so many projects are still – and until today – coming in beyond defined milestones and budgets …?

Risk-Based Cost Estimating Methods II
VersionPresentation - Final Version
TypePower Point (pptx) | Original | 2.0 MB
Acrobat (pdf) | Original | 1.8 MB
Pages31
Power Point (pptx)Original Download
Acrobat (pdf)Original Download