Download: 56. RETC 2015 Construction
Created: 23 June 2015
Document Info: Construction – You need risk-based Cost Estimating, Presentation RETC 2015. Contracting Practices Session, June 8, 2015
Remarks: Presentation developed with our business partners – thank you RiskConsult & John Reilly International.
With our publications for and at WTC15 and RETC15 we have demonstrated all necessary baselines with practical applications how to evaluate (“calculate”) schedules (milestones) and cost for any type of project with a defined reliability. And then how they may be periodically updated (“controlled”) during project execution.
We understand this approach as an internationally well-known and widely-accepted Best Practice now.
How come that so many projects are still – and until today – coming in beyond defined milestones and budgets …?
RETC 2015 Construction | |
Document Name | Construction - Risk-based Cost Estimating |
Version | Final Version |
Type | Power Point (ppt) | Original | 1.5 MBAcrobat (pdf) | Original | 1.2 MB |
Pages | 21 |
Presentation (ppt) | Original Download |
Acrobat (pdf) | Original Download |