Download: 57. RETC Paper 2015
Created: 27 May 2015
Document Info: Construction – You need Risk-Based Cost Estimating. Co-Author Philip Sander, Co-Author John J. Reilly, Paper RETC 2015.
Remarks: Paper, Alfred Moergeli with m+m, Philip Sander with RiskConsult Gmbh, John J. Reilly with John Reilly International.
With our publications for and at WTC15 and RETC15 we have demonstrated all necessary baselines with practical applications how to evaluate (“calculate”) schedules (milestones) and cost for any type of project with a defined reliability. And then how they may be periodically updated (“controlled”) during project execution.
We understand this approach as an internationally well-known and widely-accepted Best Practice now.
How come that so many projects are still – and until today – coming in beyond defined milestones and budgets …?
RETC Paper 2015 | |
Document | Construction - Risk-based Cost Estimating |
Version | Paper | Conference Proceedings |
Type | Acrobat (pdf) | Original | 0.8 MB |
Pages | 10 |
Acrobat (pdf) | Original Download |