Download: 61. Risk Management – BSVII (IRA-CA)
Created: 21 June 2018
Document Info: NAT 2018 Paper, North American Tunneling Conference 2018 @ Washington DC – USA: Bart Silicon Valley Phase II Project – Comparative Analysis by an Independent System Life-Cycle Risk Assessment.
We successfully helped our owner, Santa Clara Valley Transportation Authority, VTA, www.vta.org, to make a life-cycle cost and risk-based system decision for a Single Large Bore Tunnel that has never been built and operated before in North America so far.
Risk Management – BSVII | |
Version | Final Version |
Type | Acrobat (pdf) | Original | 1.02 MB |
Pages | 13 |
For easier printing (pdf) | Original Download |