Download: 62. Risk Management – BSVII (IRA-CA)

Created: 21 June 2018

Document Info: NAT 2018 Presentation, North American Tunneling Conference 2018 @ Washington DC – USA: Bart Silicon Valley Phase II Project – Comparative Analysis by an Independent System Life-Cycle Risk Assessment.

We successfully helped our owner, Santa Clara Valley Transportation Authority, VTA, www.vta.org, to make a life-cycle cost and risk-based system decision in favor of a Single Large Bore Tunnel that has never been built and operated before in North America so far.

Risk Management – BSVII
VersionFinal Version
TypePower Point (ppsx) | Original | 4.52 MB
Acrobat (pdf) | Original | 3.85 MB
Pages30
Power Point (pptx)Original Download
For easier printing (pdf)Original Download