62.Life Cycle Comparative Analysis (BSVII) II

moergeli+moergeli consulting engineering                                           RiskConsult               john-reilly-logo3                                      

Document Info:

NAT 2018 Presentation
North American Tunneling Conference 2018 @ Washington DC - USA:
Bart Silicon Valley Phase II Project - Comparative Analysis by an Independent System Life-Cycle Risk Assessment.

We successfully helped our owner,
Santa Clara Valley Transportation Authority, VTA, www.vta.org,
to make a life-cycle cost and risk-based system decision in favor of a Single Large Bore Tunnel that has never been built and operated before in North America so far.

 Download
Document
Name

V
[Version]

Type

MB

Risk Management –
BSVII (IRA-CA)

Final
Version
 Power Point

Original

4.52

Acrobat (pdf)

Original 3.85

Pages:


30
Presentation (pptx) Risk-Based Cost Estimating Methods
Presentation (pdf)

Risk-Based Cost Estimating Methods

Menu Download by categories

Menu Download By Numbers

Document Preview

Some of our documents have a preview option. For those which do, a separate menu will show up here. In this case you can just click the respective content number and a Lightbox will open with a document preview. Here is an example:


QM

Quality Management

The preview does not offer the full resolution. When you download the original document, the resolution will be much better.

We periodically expand our downloads. Please feel free to come back any time and have a look if there some revisions.

Please do not hesitate to ask us for an update at any time if you are not sure that you have the newest version.