64.BART Silicon Valley (Presentation)

moergeli+moergeli consulting engineering                                           RiskConsult               john-reilly-logo3                                      

Document InfoBart Silicon Valley Phase II Extension Infrastructure Program - Integrated cost & schedule life-cycle comparative risk analysis of single-bore versus twin-bore tunneling
=> Documentation of a risk-based decision to select the best solution

 

Presentation
World Tunnel Congress (WTC19)
May 5 - 9, 2019
Naples, Italy

 

 Download
Document
Name
WTC19_E-POSTER_BSVII_CRA

V
[Version]

Type

MB

 Presentation
World Tunnel Congress (WTC19)
May 5 - 9, 2019
Naples, Italy

Final
Version
 Power Point

Original

0.07

Acrobat (pdf)

Original 0.38

mp4 movie file

Original 76.6

Pages:


1
Self-starting animated Power Point Show
Runs continuously (in loop)
(ppsx)

Risk-Based Cost Estimating Methods

For easier printing

(pdf) 

origdownload 

(mp4) Video
right click to download
If you do not have access to Power Point
origdownload
(mp4) lightbox
Live video

Menu Download by categories

Menu Download By Numbers

Document Preview

Some of our documents have a preview option. For those which do, a separate menu will show up here. In this case you can just click the respective content number and a Lightbox will open with a document preview. Here is an example:


QM

Quality Management

The preview does not offer the full resolution. When you download the original document, the resolution will be much better.

We periodically expand our downloads. Please feel free to come back any time and have a look if there some revisions.

Please do not hesitate to ask us for an update at any time if you are not sure that you have the newest version.