Update No. 990 – October 1, 2023 – See News => Updates [Please click here for your direct access to our updates]
Control your risks before they control you. Everywhere – and at all times.
How do you decide under uncertainty (= risk-based)? What (total) costs do you expect? When (per which milestones)? And with which probability? How safe, productive and economic are your systems? And how long will you still be capable- and entitled – to operate and maintain them productively and legally compliant?
A Quantitative Risk Analysis (QRA) delivers reliable answers. By results within a distribution that will not be exceeded per your specified and preselected probability – your “risk appetite”. Providing you with cost and time certainty. How do you achieve that?
Please download one of our Risk Management Presentations (for the current BSVII Project @ San Jose, CA-USA) as a practical application through this link or from our Download Menu as Document No. 62. Or, of course, any other of our more than one hundred documents – ready for your download, in English and/or German, free-of-charge and without registration.
With our System Risk Management (SRM) we help you from your very first hazard identification to your qualitative risk assessment and quantitative risk analysis. And from your very first draft, design and planning through manufacturing, construction and erection to final completion, commissioning and into your operation & maintenance (O&M) phase. For the complete Life Cycle Time of your project. For all your projects.
You are not alone – we are here to help you. For more than 29 years now we have successfully supported our customers to reduce risks and to increase opportunities – worldwide. Please visit our RM Blog @ LinkedIN through this link or at https://www.linkedin.com/in/alfred-moergeli-6919296/detail/recent-activity/shares/ for a free-of-charge and exclusive introduction to our support of your RM activities. As always – any feedback is very welcome.
How can you profit yourself? One of our publications for the BSVII Project shows your value added and is available for your download through this link or from our Download Menu as Document No. 61.
Please note our General Provisions, Data Protection (Privacy) Policy and Disclaimer (through this link here as well) – thank you!
moergeli+ moergeli
  • Home
  • About Us
    • Who are we?
    • Training
      • Training 2020-2023
      • Training 2010-2019
      • Training 2002-2009
  • Your Benefits
    • Resources
    • Portfolio Analysis
    • System Risk Management
    • Safety and Health
    • CE Conformity
    • System Safety Analysis
    • Risk-based Project Management
  • News
    • What’s Up
    • Updates
  • Download
    • Download by Number
    • Download by Category
  • Media
    • Photo Albums
    • Videos
  • Support
    • Abbreviations/ Terms
    • Links
  • Sitemap
  • Contact
  • German
moergeli+ moergeli
  • Home
  • About Us
    • Who are we?
    • Training
      • Training 2020-2023
      • Training 2010-2019
      • Training 2002-2009
  • Your Benefits
    • Resources
    • Portfolio Analysis
    • System Risk Management
    • Safety and Health
    • CE Conformity
    • System Safety Analysis
    • Risk-based Project Management
  • News
    • What’s Up
    • Updates
  • Download
    • Download by Number
    • Download by Category
  • Media
    • Photo Albums
    • Videos
  • Support
    • Abbreviations/ Terms
    • Links
  • Sitemap
  • Contact
  • German

Client6

28 Feb 2015
  • BY hptschupp
  • WITH 0 COMMENTS
  • PERMALINK
  • STANDARD POST TYPE

Client6

READ MORE
28 Feb 2015
  • BY hptschupp
  • WITH 0 COMMENTS
  • PERMALINK
  • STANDARD POST TYPE

Client5

READ MORE
28 Feb 2015
  • BY hptschupp
  • WITH 0 COMMENTS
  • PERMALINK
  • STANDARD POST TYPE

Client4

READ MORE
28 Feb 2015
  • BY hptschupp
  • WITH 0 COMMENTS
  • PERMALINK
  • STANDARD POST TYPE

Client3

READ MORE
28 Feb 2015
  • BY hptschupp
  • WITH 0 COMMENTS
  • PERMALINK
  • STANDARD POST TYPE

Client2

READ MORE
28 Feb 2015
  • BY hptschupp
  • WITH 0 COMMENTS
  • PERMALINK
  • STANDARD POST TYPE

Client1

READ MORE

Search

Please enter the search term into the top search field on this page. Then click enter or click on the magnifying glass. You now will see the returns of your search. Click the Read More button to be forwarded to the respective article.

Risk Assessment

Always start with a qualitative risk assessment. Especially if you plan to go for a quantitative risk analysis (later).

Planning your controls (risk mitigation) is the real goal and most important step of any qualitative risk assessment. Read more…

Contact Switzerland

  • Rosengartenstrasse 28
    CH-8716 Schmerikon
    Switzerland
  • Phone: +41 55 282 5001
  • Email: info@moergeli.com
  • LinkedIn

Our Business Partners

Together with our business partners in Europe and overseas we are providing solutions for your challenges worldwide.

Risk Consult

Current Lighthouse Project

Happy and privileged to be able to support EuroTube Foundation (ETF)
with System Risk Management.

EuroTube – First application of a Swiss HyperLoop as a model solution for our transportation needs of tomorrow.

We use RIAAT, a software of RiskConsult GmbH.

Copyright © 2021. moergeli+moergeli consulting engineering | Design by Web Movie Creation