Photo Album 21: Bodio Lotto 554
Created: 25 December 2011
Consorzio TAT (Tunnel AlpTransit Ticino) – CE Conformity Tunnel Boring Machine (TBM) and trailing equipment.
Selection of Pictures by Alfred MOERGELI, Los 554, Tunnel Bodio, Alp-Transit Construction, Gotthard Base Tunnel, Switzerland, CE Conformity and CE Marking of Hard Rock Tunneling System, on various occasisons.
Specifically representing
– CE Conformity Declaration & required documentation
– Cutter change
– Various logistics activities
Working for and at the Gotthard Base Tunnel from 1999 until 2014, we supported all major contractors at Sedrun, Amsteg, Bodio and Faido, including the Total Services Contractor installing and commissioning the high-speed railway systems, for all required Safety Management Systems (SMS), Risk Assessments (RA), Conformity Assessments (CA) and CE Markings (CEM) of all Tunnel Boring Machines (TBM’s) and other critical equipment, project-specific audits,
Process/Safety Reviews (PSR’s) and many other second level support tasks.
The biggest thanks goes to all crews on site,
safely managing the unforeseeable (= Risk Management in Action) in high risk environments as their daily routine. Many of them moving into places every day where no human being has ever been before. Therefore, always …
“That’s one small step for (a) man, one giant leap for mankind”
(Neil Armstrong, 2:56 UTC on July 21, 1969 – First person to walk on the Moon).